TATA POWER - DDL Distribution System Outage Request From 16-Nov-2025 To 17-Dec-2025
S. No Discom Distt Zone DESCRIPTION Date  Time from Date Time to Area affected Total Duration (in Hrs)
1 TATA POWER - DDL CIVIL LINES 411 PREVENTIVE MAINTENANCE 16.11.25 11:00 16.11.25 15:00 PART OF TIS HAZARI 4
2 TATA POWER - DDL MANGOLPURI 515 PREVENTIVE MAINTENANCE 16.11.25 11:30 16.11.25 15:30  PART OF T BLK MIA 4
3 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 17.11.25 06:00 17.11.25 09:00 PART OF L BLK SEC 3 3
4 TATA POWER - DDL NARELA 522 PREVENTIVE MAINTENANCE 17.11.25 07:30 17.11.25 09:30 PART OF E 638 TO E 663 2
5 TATA POWER - DDL BADLI 507 PREVENTIVE MAINTENANCE 17.11.25 09:30 17.11.25 12:30 PART OF SGTN 3
6 TATA POWER - DDL CIVIL LINES 411 PREVENTIVE MAINTENANCE 17.11.25 10:30 17.11.25 12:30 PART OF UNDER HILL ROAD 2
7 TATA POWER - DDL KESAHAVPURAM 501 PREVENTIVE MAINTENANCE 17.11.25 10:30 17.11.25 12:30 PART OF A BLOCK KESHAVPURAM 2
8 TATA POWER - DDL MANGOLPURI 515 PROJECT WORK 17.11.25 10:30 17.11.25 12:30  PART OF G BLK MIA 2
9 TATA POWER - DDL MODEL TOWN 505 PREVENTIVE MAINTENANCE 17.11.25 10:30 17.11.25 14:30 PART OF K-BLK 751 WALI GALI 4
10 TATA POWER - DDL MODEL TOWN 505 PREVENTIVE MAINTENANCE 17.11.25 10:30 17.11.25 14:30 PART OF H-BLK JJ CLUSTER 4
11 TATA POWER - DDL MOTI NAGAR 1302 PREVENTIVE MAINTENANCE 17.11.25 10:30 17.11.25 14:30 PART OF B BLK PHASE -2 4
12 TATA POWER - DDL MOTI NAGAR 1303 PREVENTIVE MAINTENANCE 17.11.25 10:30 17.11.25 12:30 PART OF TREE TRIMMING 2
13 TATA POWER - DDL MOTI NAGAR 1302 PREVENTIVE MAINTENANCE 17.11.25 10:50 17.11.25 14:50 PART OF B BLK PHASE-2 NIA 4
14 TATA POWER - DDL BADLI 516 PREVENTIVE MAINTENANCE 17.11.25 11:00 17.11.25 15:00  PART OF DEEP VIHAR 4
15 TATA POWER - DDL BAWANA 521 PROJECT WORK 17.11.25 11:00 17.11.25 15:00 PART OF POOTH VILL AND 4
16 TATA POWER - DDL BAWANA 533 PREVENTIVE MAINTENANCE 17.11.25 11:00 17.11.25 15:00 PART OF KANJHAWALA INDUSTRIAL AREA 4
17 TATA POWER - DDL KIRARI 513 PROJECT WORK 17.11.25 11:00 17.11.25 15:00 PART OF RAMA VIHAR 4
18 TATA POWER - DDL KIRARI 523 PREVENTIVE MAINTENANCE 17.11.25 11:00 17.11.25 15:00 PART OF STATION BLOCK 4
19 TATA POWER - DDL MANGOLPURI 519 PREVENTIVE MAINTENANCE 17.11.25 11:00 17.11.25 13:00 PART OF O&P BLOCK KRISHAN VIHAR 2
20 TATA POWER - DDL MODEL TOWN 402 PREVENTIVE MAINTENANCE 17.11.25 11:00 17.11.25 13:00  PART OF ADARSH NAGAR 2
21 TATA POWER - DDL NARELA 511 PREVENTIVE MAINTENANCE 17.11.25 11:00 17.11.25 15:00 PART OF ZINDPUR 4
22 TATA POWER - DDL NARELA 514 PREVENTIVE MAINTENANCE 17.11.25 11:00 17.11.25 15:00 PART OF BANKNER VILLAGE 4
23 TATA POWER - DDL NARELA 517 PREVENTIVE MAINTENANCE 17.11.25 11:00 17.11.25 15:00 PART OF SINGHOLA 4
24 TATA POWER - DDL ROHINI 581 PREVENTIVE MAINTENANCE 17.11.25 11:00 17.11.25 15:00 PART OF BADLI VILLAGE 4
25 TATA POWER - DDL KIRARI 513 PREVENTIVE MAINTENANCE 17.11.25 12:00 17.11.25 16:00 PART OF PARVESH NAGAR 4
26 TATA POWER - DDL MANGOLPURI 518 PREVENTIVE MAINTENANCE 17.11.25 12:00 17.11.25 16:00 PART OF RAJ PARK PARTIALY , HARIZEN BSTI PARTIALY 4
27 TATA POWER - DDL MANGOLPURI 518 PREVENTIVE MAINTENANCE 17.11.25 12:30 17.11.25 16:30 PART OF EAST FRIENDS ENCLAVE PARTIALY AND BERI WALA BAGH. 4
28 TATA POWER - DDL CIVIL LINES 411 PREVENTIVE MAINTENANCE 17.11.25 14:00 17.11.25 16:00 PART OF DMRC FLATS 2
29 TATA POWER - DDL MOTI NAGAR 1303 PREVENTIVE MAINTENANCE 17.11.25 14:30 17.11.25 16:00 PART OF A BLOCK SUDERSHAN PARK 2
30 TATA POWER - DDL PITAMPURA 508 PREVENTIVE MAINTENANCE 17.11.25 14:30 17.11.25 16:00 PART OF SACHDEVA PUBLIC SCHOOL 2
31 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 18.11.25 06:00 18.11.25 09:00 PART OF B BLK SEC 4 DSIIDC BAWANA 3
32 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 18.11.25 06:00 18.11.25 09:00 PART OF B BLK SEC 4 DSIIDC BAWANA 3
33 TATA POWER - DDL NARELA 522 PREVENTIVE MAINTENANCE 18.11.25 07:30 18.11.25 09:30 PART OF  E 887 TO E 919 2
34 TATA POWER - DDL BAWANA 533 PREVENTIVE MAINTENANCE 18.11.25 10:00 18.11.25 13:00 PART OF JJ COLONY 3
35 TATA POWER - DDL NARELA 514 METERING WORK 18.11.25 10:00 18.11.25 11:00 PART OF  GHOGHA VILAGE 1
36 TATA POWER - DDL NARELA 514 METERING WORK 18.11.25 10:00 18.11.25 11:00 PART OF  LAMPUR VILLAGE 1
37 TATA POWER - DDL NARELA 514 METERING WORK 18.11.25 10:00 18.11.25 11:00 PART OF  NARELA MANDI RAILWAY ROAD 1
38 TATA POWER - DDL BAWANA 512 PREVENTIVE MAINTENANCE 18.11.25 10:30 18.11.25 13:30 PART OF LAMBA PANA QUTUBGARH 3
39 TATA POWER - DDL BAWANA 533 PREVENTIVE MAINTENANCE 18.11.25 10:30 18.11.25 13:00 PART OF GHEVRA VILLAGE 3
40 TATA POWER - DDL CIVIL LINES 418 PREVENTIVE MAINTENANCE 18.11.25 10:30 18.11.25 12:30 PART OF  A BLK NEHRU VIHAR 2
41 TATA POWER - DDL MODEL TOWN 505 PREVENTIVE MAINTENANCE 18.11.25 10:30 18.11.25 13:00 PART OF RAMGARH NO-2 HVDS 3
42 TATA POWER - DDL NARELA 522 PREVENTIVE MAINTENANCE 18.11.25 10:30 18.11.25 14:30 PART OF A9 SECTION 4
43 TATA POWER - DDL BADLI 507 PREVENTIVE MAINTENANCE 18.11.25 11:00 18.11.25 13:00 PART OF SAMAY PUR 2
44 TATA POWER - DDL CIVIL LINES 416 PROJECT WORK 18.11.25 11:00 18.11.25 15:00 PART OF GURMANDI 4
45 TATA POWER - DDL KIRARI 513 PREVENTIVE MAINTENANCE 18.11.25 11:00 18.11.25 15:00 PART OF SUKHBIR NAGAR 4
46 TATA POWER - DDL KIRARI 513 PREVENTIVE MAINTENANCE 18.11.25 11:00 18.11.25 15:00 PART OF GALI NO 6 JAIN NAGAR 4
47 TATA POWER - DDL KIRARI 523 PROJECT WORK 18.11.25 11:00 18.11.25 15:00 PART OF RAMESH ENCLAVE 4
48 TATA POWER - DDL MANGOLPURI 515 PROJECT WORK 18.11.25 11:00 18.11.25 15:00  PART OF D BLK MIA 4
49 TATA POWER - DDL MANGOLPURI 518 PREVENTIVE MAINTENANCE 18.11.25 11:00 18.11.25 13:30  PART OF T BLK MIA 2
50 TATA POWER - DDL MANGOLPURI 519 PROJECT WORK 18.11.25 11:00 18.11.25 12:00 PART OF SEC-22 ROHINI 1
51 TATA POWER - DDL MODEL TOWN 415 PREVENTIVE MAINTENANCE 18.11.25 11:00 18.11.25 13:00  PART OF SUBZI MANDI 2
52 TATA POWER - DDL MODEL TOWN 415 PREVENTIVE MAINTENANCE 18.11.25 11:00 18.11.25 13:00  PART OF SUBZI MANDI 2
53 TATA POWER - DDL MODEL TOWN 415 PREVENTIVE MAINTENANCE 18.11.25 11:00 18.11.25 13:00  PART OF SUBZI MANDI 2
54 TATA POWER - DDL MODEL TOWN 505 PREVENTIVE MAINTENANCE 18.11.25 11:00 18.11.25 15:00 PART OF C-BLK 4
55 TATA POWER - DDL NARELA 511 PREVENTIVE MAINTENANCE 18.11.25 11:00 18.11.25 13:00 PART OF DCM 2
56 TATA POWER - DDL NARELA 514 PREVENTIVE MAINTENANCE 18.11.25 11:00 18.11.25 15:00 PART OF SWATANTER NAGAER 4
57 TATA POWER - DDL SHALIMARBAGH 503 PROJECT WORK 18.11.25 11:00 18.11.25 15:00 PART OF MUKUNDPUR & JANTA VIHAR 4
58 TATA POWER - DDL NARELA 511 PREVENTIVE MAINTENANCE 18.11.25 11:15 18.11.25 13:15 PART OF DCM 2
59 TATA POWER - DDL MANGOLPURI 518 PREVENTIVE MAINTENANCE 18.11.25 12:00 18.11.25 14:00 PART OF P-4 BLK S. PURI PARTIALYPARTIALY AREA OF P-4 BLK SULTANPURI .5 2
60 TATA POWER - DDL MANGOLPURI 519 PROJECT WORK 18.11.25 12:00 18.11.25 14:00 PART OF O&P BLOCK KRISHAN VIHAR 2
61 TATA POWER - DDL NARELA 514 METERING WORK 18.11.25 12:00 18.11.25 13:00 PART OF  NARELA BAZAR 1
62 TATA POWER - DDL NARELA 514 METERING WORK 18.11.25 12:00 18.11.25 13:00 PART OF  SWATANTRA NAGAR A PART 1
63 TATA POWER - DDL NARELA 514 METERING WORK 18.11.25 12:00 18.11.25 13:00 PART OF  PUNJABI COLONY NARELA MANDI 1
64 TATA POWER - DDL NARELA 514 METERING WORK 18.11.25 12:00 18.11.25 13:00 PART OF  GHPGHA VILLAGE 1
65 TATA POWER - DDL BADLI 507 PREVENTIVE MAINTENANCE 18.11.25 14:00 18.11.25 16:00 PART OF SAMAY PUR 2
66 TATA POWER - DDL BAWANA 533 PREVENTIVE MAINTENANCE 18.11.25 14:00 18.11.25 16:00 PART OF DUSIB FLAT 2
67 TATA POWER - DDL BAWANA 533 PREVENTIVE MAINTENANCE 18.11.25 14:00 18.11.25 16:00 PART OF H BLOCK JJ COLONY 2
68 TATA POWER - DDL CIVIL LINES 418 PREVENTIVE MAINTENANCE 18.11.25 14:00 18.11.25 16:00 PART OF  C BLK NEHRU VIHAR 2
69 TATA POWER - DDL MODEL TOWN 415 PREVENTIVE MAINTENANCE 18.11.25 14:00 18.11.25 16:00  PART OF D' BLOCK SAUBZI MANDI 2
70 TATA POWER - DDL NARELA 511 PREVENTIVE MAINTENANCE 18.11.25 14:00 18.11.25 16:00 PART OF DCM 2
71 TATA POWER - DDL NARELA 511 PREVENTIVE MAINTENANCE 18.11.25 14:00 18.11.25 16:00 PART OF IBRAHIMPUR 2
72 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 19.11.25 06:00 19.11.25 09:00 PART OF K BLK SEC 2 3
73 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 19.11.25 06:15 19.11.25 09:15 PART OF K BLK SEC 2 3
74 TATA POWER - DDL BAWANA 533 PREVENTIVE MAINTENANCE 19.11.25 10:30 19.11.25 14:00 PART OF A BLOCK COLONY 4
75 TATA POWER - DDL BAWANA 533 PREVENTIVE MAINTENANCE 19.11.25 10:30 19.11.25 13:00 PART OF K BLOCK 3
76 TATA POWER - DDL CIVIL LINES 418 PREVENTIVE MAINTENANCE 19.11.25 10:30 19.11.25 12:30 PART OF  TRUCK PARKING 2
77 TATA POWER - DDL KESAHAVPURAM 501 PREVENTIVE MAINTENANCE 19.11.25 10:30 19.11.25 14:30 PART OF OF C- BLOCK KESHAVPURAM 4
78 TATA POWER - DDL MODEL TOWN 505 PREVENTIVE MAINTENANCE 19.11.25 10:30 19.11.25 13:00 PART OF RAMGARH NO-2 HVDS 3
79 TATA POWER - DDL MOTI NAGAR 1304 PREVENTIVE MAINTENANCE 19.11.25 10:30 19.11.25 13:00 PART OF  FORECAST PUSA 3
80 TATA POWER - DDL NARELA 522 PREVENTIVE MAINTENANCE 19.11.25 10:30 19.11.25 14:30 PART OF  A5 MARKET AND KV SCHOOL 4
81 TATA POWER - DDL BAWANA 521 PROJECT WORK 19.11.25 11:00 19.11.25 15:00 PART OF POOTH KHURD VILLAGE 4
82 TATA POWER - DDL KIRARI 513 PROJECT WORK 19.11.25 11:00 19.11.25 14:00 PART OF RAMA VIHAR 3
83 TATA POWER - DDL KIRARI 513 PREVENTIVE MAINTENANCE 19.11.25 11:00 19.11.25 15:00 PART OF SUKHBIR NAGAR 4
84 TATA POWER - DDL KIRARI 523 PREVENTIVE MAINTENANCE 19.11.25 11:00 19.11.25 13:00 PART OF LMP BLOCK 2
85 TATA POWER - DDL MANGOLPURI 518 PREVENTIVE MAINTENANCE 19.11.25 11:00 19.11.25 15:00 PART OF P-4 BLK S. [PURI PARTIALY 4
86 TATA POWER - DDL MANGOLPURI 519 PREVENTIVE MAINTENANCE 19.11.25 11:00 19.11.25 13:00 PART OF BUDH VIHAR 2
87 TATA POWER - DDL MODEL TOWN 402 PREVENTIVE MAINTENANCE 19.11.25 11:00 19.11.25 14:00  PART OF GTK 3
88 TATA POWER - DDL NARELA 511 PROJECT WORK 19.11.25 11:00 19.11.25 15:00 PART OF ZINDPUR VILLAGE 4
89 TATA POWER - DDL NARELA 514 PROJECT WORK 19.11.25 11:00 19.11.25 15:00 PART OF SWATANTER NAGER 4
90 TATA POWER - DDL KESAHAVPURAM 502 PROJECT WORK 19.11.25 11:30 19.11.25 15:30 PART OF WPIA 4
91 TATA POWER - DDL BAWANA 533 PREVENTIVE MAINTENANCE 19.11.25 14:00 19.11.25 16:00 PART OF JJ COLONY 2
92 TATA POWER - DDL CIVIL LINES 418 PREVENTIVE MAINTENANCE 19.11.25 14:00 19.11.25 16:00 PART OF BD ESTATE 2
93 TATA POWER - DDL MANGOLPURI 519 PREVENTIVE MAINTENANCE 19.11.25 14:00 19.11.25 16:00 PART OF RAJEEV NAGAR 2
94 TATA POWER - DDL MANGOLPURI 519 PROJECT WORK 19.11.25 14:00 19.11.25 16:00 PART OF SEC-22 ROHINI 2
95 TATA POWER - DDL MANGOLPURI 519 PROJECT WORK 19.11.25 14:00 19.11.25 16:00 PART OF DDA STREET LIGHT 2
96 TATA POWER - DDL BAWANA 533 PREVENTIVE MAINTENANCE 19.11.25 14:30 19.11.25 16:00 PART OF A BLOCK 2
97 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 20.11.25 06:00 20.11.25 09:00 PART OF E BLK SEC 2 3
98 TATA POWER - DDL CIVIL LINES 418 PREVENTIVE MAINTENANCE 20.11.25 10:30 20.11.25 12:30 PART OF WAZIRABAD 2
99 TATA POWER - DDL MODEL TOWN 505 PREVENTIVE MAINTENANCE 20.11.25 10:30 20.11.25 13:00 PART OF E-BLK 3
100 TATA POWER - DDL KIRARI 513 PROJECT WORK 20.11.25 11:00 20.11.25 15:00 PART OF MADANPUR 4
101 TATA POWER - DDL MANGOLPURI 518 PREVENTIVE MAINTENANCE 20.11.25 11:00 20.11.25 15:00  PART OF P-1 SULTANPURI 4
102 TATA POWER - DDL MANGOLPURI 519 PREVENTIVE MAINTENANCE 20.11.25 11:00 20.11.25 15:00 PART OF PKT-8 SEC-21 ROHINI 4
103 TATA POWER - DDL MANGOLPURI 519 PREVENTIVE MAINTENANCE 20.11.25 11:00 20.11.25 15:00 PART OF POOTHKALAN HVDS 4
104 TATA POWER - DDL MODEL TOWN 402 PREVENTIVE MAINTENANCE 20.11.25 11:00 20.11.25 13:00  PART OF MAHNEDRU 2
105 TATA POWER - DDL NARELA 514 PREVENTIVE MAINTENANCE 20.11.25 11:00 20.11.25 15:00 PART OF SWT NAGAR 4
106 TATA POWER - DDL ROHINI 551 PREVENTIVE MAINTENANCE 20.11.25 11:00 20.11.25 13:00 PART OF SEC-3 2
107 TATA POWER - DDL KIRARI 513 PROJECT WORK 20.11.25 13:00 20.11.25 16:00 PART OF RAMA VIHAR 3
108 TATA POWER - DDL BADLI 507 PREVENTIVE MAINTENANCE 20.11.25 14:00 20.11.25 16:00 PART OF SAMAY PUR 2
109 TATA POWER - DDL BADLI 507 PREVENTIVE MAINTENANCE 20.11.25 14:00 20.11.25 16:00 PART OF SAMAY PUR 2
110 TATA POWER - DDL CIVIL LINES 418 PREVENTIVE MAINTENANCE 20.11.25 14:00 20.11.25 16:00 PART OF  3 CAVALRY LINES 2
111 TATA POWER - DDL MODEL TOWN 402 PREVENTIVE MAINTENANCE 20.11.25 14:00 20.11.25 16:00  PART OF MAHENDRU 2
112 TATA POWER - DDL ROHINI 551 PREVENTIVE MAINTENANCE 20.11.25 14:00 20.11.25 16:00 PART OF SEC-3 2
113 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 21.11.25 06:00 21.11.25 09:00 PART OF I BLK SEC 5 3
114 TATA POWER - DDL CIVIL LINES 418 PREVENTIVE MAINTENANCE 21.11.25 10:30 21.11.25 12:30 PART OF T TIBETAN CAMP 2
115 TATA POWER - DDL KESAHAVPURAM 502 PREVENTIVE MAINTENANCE 21.11.25 10:30 21.11.25 12:30 PART OF WPIA 2
116 TATA POWER - DDL BAWANA 533 PREVENTIVE MAINTENANCE 21.11.25 11:00 21.11.25 15:00 PART OF N BLOCK 4
117 TATA POWER - DDL KIRARI 513 PREVENTIVE MAINTENANCE 21.11.25 11:00 21.11.25 15:00 PART OF AGAR NAGAR 4
118 TATA POWER - DDL MANGOLPURI 518 PREVENTIVE MAINTENANCE 21.11.25 11:00 21.11.25 15:00  PART OF P1 SULTANPURI 4
119 TATA POWER - DDL MANGOLPURI 519 METERING WORK 21.11.25 11:00 21.11.25 15:00 PART OF PKT-5 SEC-22 4
120 TATA POWER - DDL ROHINI 551 PREVENTIVE MAINTENANCE 21.11.25 11:00 21.11.25 13:00 PART OF  PARTIAL C-BLOCK AVANTIKA 2
121 TATA POWER - DDL CIVIL LINES 418 PREVENTIVE MAINTENANCE 21.11.25 14:00 21.11.25 16:00 PART OF F SIGNATURE BRIDGE 2
122 TATA POWER - DDL ROHINI 551 PREVENTIVE MAINTENANCE 21.11.25 14:00 21.11.25 16:00 PART OF AVANTIKA SEC-1 2
123 TATA POWER - DDL BAWANA 521 PROJECT WORK 22.11.25 08:30 22.11.25 14:30 PART OF K & L BLK SEC 5 6
124 TATA POWER - DDL CIVIL LINES 418 PREVENTIVE MAINTENANCE 22.11.25 10:30 22.11.25 12:30 PART OF  PROBYN ROAD 2
125 TATA POWER - DDL BADLI 507 PREVENTIVE MAINTENANCE 22.11.25 11:00 22.11.25 13:00 PART OF SAMAY PUR 2
126 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 22.11.25 11:00 22.11.25 13:00 PART OF O,L AND H BLK SEC 3 2
127 TATA POWER - DDL MANGOLPURI 519 PREVENTIVE MAINTENANCE 22.11.25 11:00 22.11.25 15:00 PART OF PKT-10 SEC-21 ROHINI 4
128 TATA POWER - DDL NARELA 511 PREVENTIVE MAINTENANCE 22.11.25 11:00 22.11.25 15:00 PART OF KUSHAK NO-1 4
129 TATA POWER - DDL ROHINI 551 PREVENTIVE MAINTENANCE 22.11.25 11:00 22.11.25 13:00 PART OF SEC-1 2
130 TATA POWER - DDL BADLI 507 PREVENTIVE MAINTENANCE 22.11.25 14:00 22.11.25 16:00 PART OF SAMAY PUR 2
131 TATA POWER - DDL CIVIL LINES 418 PREVENTIVE MAINTENANCE 22.11.25 14:00 22.11.25 16:00 PART OF  MAURICE NAGAR 2
132 TATA POWER - DDL ROHINI 551 PREVENTIVE MAINTENANCE 22.11.25 14:00 22.11.25 16:00 PART OF SEC-1 2
133 TATA POWER - DDL KIRARI 513 PROJECT WORK 23.11.25 11:00 23.11.25 15:00 PART OF PKT C1 ESS 8 SEC-37 4
134 TATA POWER - DDL ROHINI 551 PREVENTIVE MAINTENANCE 23.11.25 14:00 23.11.25 16:00 PART OF VIJAY VIHAR-2 2
135 TATA POWER - DDL CIVIL LINES 418 PREVENTIVE MAINTENANCE 24.11.25 10:30 24.11.25 12:30 PART OF BANTA SINGH 2
136 TATA POWER - DDL KIRARI 513 PREVENTIVE MAINTENANCE 24.11.25 11:00 24.11.25 15:00 PART OF VIDYAPATI NAGAR 4
137 TATA POWER - DDL MANGOLPURI 519 PROJECT WORK 24.11.25 11:00 24.11.25 15:00 PART OF KRISHAN VIHAR NO-1 HVDS 4
138 TATA POWER - DDL CIVIL LINES 418 PREVENTIVE MAINTENANCE 24.11.25 14:00 24.11.25 16:00 PART OF  SINDHI BABA 2
139 TATA POWER - DDL CIVIL LINES 411 PREVENTIVE MAINTENANCE 25.11.25 10:30 25.11.25 12:30 PART OF ALIPUR ROAD 2
140 TATA POWER - DDL MANGOLPURI 519 PROJECT WORK 25.11.25 11:00 25.11.25 15:00 PART OF HARSHDEV PARK 4
141 TATA POWER - DDL CIVIL LINES 418 PREVENTIVE MAINTENANCE 25.11.25 14:00 25.11.25 16:00 PART OF  3 CAVALRY LINES 2
142 TATA POWER - DDL KIRARI 513 PREVENTIVE MAINTENANCE 28.11.25 11:00 28.11.25 15:00 PART OF RANIKHERA 4
143 TATA POWER - DDL ROHINI 551 PREVENTIVE MAINTENANCE 30.11.25 11:00 30.11.25 15:00 PART OF VIJAY VIHAR-2 4
144 TATA POWER - DDL KIRARI 513 PREVENTIVE MAINTENANCE 01.12.25 13:00 01.12.25 16:00 PART OF SUKHBIR NAGAR  3
145 TATA POWER - DDL SHALIMARBAGH 532 PREVENTIVE MAINTENANCE 03.12.25 10:30 03.12.25 13:30 PART OF HARIZAN BASTI 3