Schedule Outage


1 TATA POWER - DDL BADLI 516 PREVENTIVE MAINTENANCE 29.04.24 11:00 29.04.24 16:00 PART OF SEC-28 5
2 TATA POWER - DDL BADLI 572 PREVENTIVE MAINTENANCE 29.04.24 10:00 29.04.24 12:00 PART OF KHERA GARHI 2
3 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 29.04.24 11:15 29.04.24 13:15 PART OF POOTH KHURD 2
4 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 29.04.24 11:30 29.04.24 13:30 PART OF SULTANPUR 2
5 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 29.04.24 14:00 29.04.24 16:00 PARTIAL AREA OF POOTH KHURD 2
6 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 29.04.24 14:00 29.04.24 16:00 PART OF SULTANPUR 2
8 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 29.04.24 10:30 29.04.24 14:30 PART OF POOTH VILLAGE 4
9 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 29.04.24 06:00 29.04.24 09:00 PART OF N BLK SEC 2 3
10 TATA POWER - DDL CIVIL LINES 411 PREVENTIVE MAINTENANCE 29.04.24 14:00 29.04.24 16:00 PART OF REFUGEE CAMP 2
11 TATA POWER - DDL CIVIL LINES 411 PREVENTIVE MAINTENANCE 28.04.24 11:00 28.04.24 13:00 PART OF UNDER HILL ROAD 2
12 TATA POWER - DDL CIVIL LINES 411 PREVENTIVE MAINTENANCE 28.04.24 14:00 28.04.24 16:00 PART OF BISHNOI DHARMASHALA , IP COLLEGE 2
13 TATA POWER - DDL CIVIL LINES 416 PREVENTIVE MAINTENANCE 29.04.24 11:00 29.04.24 13:00 PART OF POLO GROUND AFFECTED 2
14 TATA POWER - DDL CIVIL LINES 418 PREVENTIVE MAINTENANCE 29.04.24 10:30 29.04.24 12:30 PART OF CIVIL LINES 2
15 TATA POWER - DDL KESAHAVPURAM 502 PREVENTIVE MAINTENANCE 29.04.24 10:45 29.04.24 12:45 PARTS OF ASV PH-1 2
16 TATA POWER - DDL KIRARI 513 PREVENTIVE MAINTENANCE 29.04.24 11:00 29.04.24 15:00 PART OF AGAR NAGAR 4
17 TATA POWER - DDL KIRARI 513 PROJECT WORK 29.04.24 11:00 29.04.24 15:00 PART OF UTSAV VIHAR AND SUKHBIR NAGAR 4
18 TATA POWER - DDL MANGOLPURI 515 PROJECT WORK 28.04.24 09:00 28.04.24 15:00 SOME PART OF T5 BLK MIA 6
19 TATA POWER - DDL MANGOLPURI 515 PROJECT WORK 28.04.24 10:00 28.04.24 16:00 SOME PART OF B BLK 6
20 TATA POWER - DDL MANGOLPURI 515 PREVENTIVE MAINTENANCE 28.04.24 10:00 28.04.24 16:00 SOME PART OF B BLK MIA 6
21 TATA POWER - DDL MANGOLPURI 518 PREVENTIVE MAINTENANCE 29.04.24 10:30 29.04.24 12:30 PART OF F-1,5 S.PURI 2
22 TATA POWER - DDL MANGOLPURI 518 PREVENTIVE MAINTENANCE 29.04.24 14:00 29.04.24 16:00 PART OF F-1 S.PURI 2
23 TATA POWER - DDL MANGOLPURI 519 METERING WORK 29.04.24 11:00 29.04.24 12:00 PART OF SEC-20 ROHINI 1
24 TATA POWER - DDL MANGOLPURI 519 METERING WORK 29.04.24 12:30 29.04.24 13:30 PART OF SEC-20 ROHINI 1
25 TATA POWER - DDL MANGOLPURI 519 METERING WORK 29.04.24 14:00 29.04.24 15:00 PART OF SEC-20 ROHINI 1
26 TATA POWER - DDL MANGOLPURI 519 METERING WORK 29.04.24 15:30 29.04.24 16:00 PART OF POOTH KALAN 1
27 TATA POWER - DDL MANGOLPURI 519 PREVENTIVE MAINTENANCE 29.04.24 11:00 29.04.24 15:00 PART OF BUDH VIHAR PH-2 4
30 TATA POWER - DDL MODEL TOWN 413 PREVENTIVE MAINTENANCE 29.04.24 11:00 29.04.24 13:00 PART OF GANDHI ASHRAM, HARIJAN SEWAK SANGH 2
32 TATA POWER - DDL MODEL TOWN 505 PREVENTIVE MAINTENANCE 29.04.24 10:30 29.04.24 14:30 PART OF D-BLK 4
33 TATA POWER - DDL MODEL TOWN 505 PREVENTIVE MAINTENANCE 29.04.24 10:30 29.04.24 14:30 PART OF D BLK 4
34 TATA POWER - DDL MOTI NAGAR 1301 PREVENTIVE MAINTENANCE 29.04.24 08:00 29.04.24 12:00 PART OF WZ-KIRTI NAGAR 4
35 TATA POWER - DDL MOTI NAGAR 1302 PREVENTIVE MAINTENANCE 29.04.24 09:00 29.04.24 13:00 PART OF NARAINA PH-2 4
36 TATA POWER - DDL MOTI NAGAR 1302 PREVENTIVE MAINTENANCE 29.04.24 11:00 29.04.24 14:00 PART OF NIA PH-2 3
38 TATA POWER - DDL NARELA 514 PREVENTIVE MAINTENANCE 29.04.24 11:00 29.04.24 15:00 PART OF A5 PKT-11 4
39 TATA POWER - DDL NARELA 517 PREVENTIVE MAINTENANCE 29.04.24 11:00 29.04.24 15:00 PART OF TIGIPUR 4
40 TATA POWER - DDL NARELA 522 PREVENTIVE MAINTENANCE 29.04.24 10:30 29.04.24 12:30 PART OF NARELA 2
41 TATA POWER - DDL PITAMPURA 504 PREVENTIVE MAINTENANCE 29.04.24 07:00 29.04.24 09:00 PART OF C BLK MIA -PH 2 2
43 TATA POWER - DDL SHALIMARBAGH 414 PREVENTIVE MAINTENANCE 29.04.24 11:00 29.04.24 13:00 PART OF KAMAL VIHAR 2
44 TATA POWER - DDL BADLI 507 PREVENTIVE MAINTENANCE 30.04.24 12:00 30.04.24 16:00 A PART AREA OF SAMAYPUR 04:00:00
45 TATA POWER - DDL BADLI 516 PREVENTIVE MAINTENANCE 05.05.24 11:00 05.05.24 16:00 PART OF SAHABAD 05:00:00
46 TATA POWER - DDL BADLI 516 PREVENTIVE MAINTENANCE 04.05.24 11:00 04.05.24 16:00 PART OF SHIV VIHAR 05:00:00
47 TATA POWER - DDL BADLI 516 PREVENTIVE MAINTENANCE 03.05.24 12:00 03.05.24 16:00 PART OF SAHABAD DAIRY 04:00:00
48 TATA POWER - DDL BADLI 516 PREVENTIVE MAINTENANCE 02.05.24 11:00 02.05.24 16:00 PART OF SEC-35 05:00:00
49 TATA POWER - DDL BADLI 516 PREVENTIVE MAINTENANCE 01.05.24 11:00 01.05.24 15:00 PART OF SAHABAD 04:00:00
50 TATA POWER - DDL BADLI 516 PREVENTIVE MAINTENANCE 01.05.24 11:00 01.05.24 16:00 PART OF PRAHLADPUR 05:00:00
51 TATA POWER - DDL BADLI 516 PREVENTIVE MAINTENANCE 30.04.24 11:00 30.04.24 16:00 PART OF PRAHLAD VIHAR 05:00:00
52 TATA POWER - DDL BADLI 516 PREVENTIVE MAINTENANCE 30.04.24 11:00 30.04.24 16:00 PART OF SEC-28 05:00:00
53 TATA POWER - DDL BADLI 572 PREVENTIVE MAINTENANCE 01.05.24 10:00 01.05.24 16:00 PART OF DJB 06:00:00
54 TATA POWER - DDL BADLI 572 PREVENTIVE MAINTENANCE 01.05.24 10:30 01.05.24 12:30 PART OF KHERA KALAN 02:00:00
55 TATA POWER - DDL BADLI 572 PREVENTIVE MAINTENANCE 01.05.24 14:00 01.05.24 16:00 PART OF KHERA KALAN 02:00:00
56 TATA POWER - DDL BADLI 572 PREVENTIVE MAINTENANCE 30.04.24 10:00 30.04.24 12:00 PART OF ALIPUR 02:00:00
57 TATA POWER - DDL BADLI 572 PREVENTIVE MAINTENANCE 30.04.24 12:00 30.04.24 14:00 PART OF ALIPUR 02:00:00
58 TATA POWER - DDL BAWANA 512 PREVENTIVE MAINTENANCE 02.05.24 10:00 02.05.24 16:00 PART OF NANGAL AGRI. 06:00:00
59 TATA POWER - DDL BAWANA 512 PREVENTIVE MAINTENANCE 02.05.24 10:30 02.05.24 12:30 PART OF QUTUBGARH 02:00:00
60 TATA POWER - DDL BAWANA 512 PREVENTIVE MAINTENANCE 02.05.24 14:00 02.05.24 16:00 PART OF MUNGESHPUR 02:00:00
61 TATA POWER - DDL BAWANA 512 PREVENTIVE MAINTENANCE 03.05.24 10:30 03.05.24 12:30 PART OF BAWANA 02:00:00
62 TATA POWER - DDL BAWANA 512 PREVENTIVE MAINTENANCE 03.05.24 14:00 03.05.24 16:30 PART OF DARYAPUR 02:30:00
63 TATA POWER - DDL BAWANA 512 PREVENTIVE MAINTENANCE 30.04.24 10:30 30.04.24 14:30 PART OF BAJITPUR AGRICULTURE 04:00:00
64 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 30.04.24 11:30 30.04.24 13:30 PART OF POOTH KHURD 02:00:00
65 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 30.04.24 11:15 30.04.24 13:15 PART OF SULTAN PUR 02:00:00
66 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 30.04.24 14:00 30.04.24 16:00 PART OF POOTH KHURD 02:00:00
67 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 30.04.24 14:00 30.04.24 16:00 PART OF SULTANPUR 02:00:00
68 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 01.05.24 06:00 01.05.24 09:00 PART OF A BLK SEC 5 03:00:00
69 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 02.05.24 06:00 02.05.24 09:00 PART OF A BLK SEC 5 03:00:00
70 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 03.05.24 06:00 03.05.24 09:00 PART OF A BLK SEC 5 03:00:00
71 TATA POWER - DDL BAWANA 521 PREVENTIVE MAINTENANCE 30.04.24 06:00 30.04.24 09:00 PART OF M BLK SEC 3 03:00:00
72 TATA POWER - DDL BAWANA 533 PREVENTIVE MAINTENANCE 02.05.24 10:00 02.05.24 12:00 PART OF CHANDPUR MAJRA VILLAGE 02:00:00
73 TATA POWER - DDL CIVIL LINES 411 PREVENTIVE MAINTENANCE 30.04.24 11:00 30.04.24 13:00 PART OF CIVIL LINES 02:00:00
74 TATA POWER - DDL CIVIL LINES 411 PREVENTIVE MAINTENANCE 30.04.24 14:00 30.04.24 16:00 PART OF RAJPUR ROAD 02:00:00
75 TATA POWER - DDL CIVIL LINES 416 PREVENTIVE MAINTENANCE 02.05.24 11:15 02.05.24 13:15 PART OF GURMANDI 02:00:00
76 TATA POWER - DDL KIRARI 513 PREVENTIVE MAINTENANCE 01.05.24 11:00 01.05.24 15:00 PART OF GALI NO 3 JAIN NAGAR 04:00:00
77 TATA POWER - DDL KIRARI 513 PREVENTIVE MAINTENANCE 04.05.24 14:00 04.05.24 16:00 PARTS OF JAIN NAGAR 02:00:00
78 TATA POWER - DDL KIRARI 513 PREVENTIVE MAINTENANCE 04.05.24 11:00 04.05.24 13:00 PARTS OF JAIN NAGR 02:00:00
79 TATA POWER - DDL KIRARI 513 PROJECT WORK 02.05.24 11:00 02.05.24 15:00 PART OF RANIKHERA 04:00:00
80 TATA POWER - DDL KIRARI 513 PREVENTIVE MAINTENANCE 30.04.24 11:00 30.04.24 15:00 PART OF MUBARAKPUR VILLAGE 04:00:00
81 TATA POWER - DDL KIRARI 513 PREVENTIVE MAINTENANCE 03.05.24 11:00 03.05.24 15:00 PART OF SHARMA ENCLAVE 04:00:00
82 TATA POWER - DDL KIRARI 513 PREVENTIVE MAINTENANCE 06.05.24 11:00 06.05.24 13:00 PARTS OF SUKHBEER NAGAR 02:00:00
83 TATA POWER - DDL MANGOLPURI 519 METERING WORK 30.04.24 15:30 30.04.24 16:30 PART OF BUDH VIHAR PHASE-1 01:00:00
84 TATA POWER - DDL MANGOLPURI 519 PREVENTIVE MAINTENANCE 30.04.24 11:00 30.04.24 15:00 PART OF SEC-22 04:00:00
85 TATA POWER - DDL MODEL TOWN 402 METERING WORK 01.05.24 10:30 01.05.24 12:30 PART OF B-BLOCK INDUSTRIAL GTK 02:00:00
86 TATA POWER - DDL MODEL TOWN 402 METERING WORK 01.05.24 10:30 01.05.24 12:30 PART OF B-BLOCK INDUSTRIAL GTK 02:00:00
87 TATA POWER - DDL MODEL TOWN 402 METERING WORK 01.05.24 14:30 01.05.24 16:30 PART OF B-BLK. GTK 02:00:00
88 TATA POWER - DDL MODEL TOWN 402 PREVENTIVE MAINTENANCE 04.05.24 11:00 04.05.24 13:00 SOME PARTS OF MAJLIS PARK. 02:00:00
89 TATA POWER - DDL MODEL TOWN 505 PROJECT WORK 30.04.24 10:30 30.04.24 14:30 PART OF D-BLK 04:00:00
90 TATA POWER - DDL MODEL TOWN 505 PROJECT WORK 30.04.24 10:30 30.04.24 14:30 PART OF D-BLK 04:00:00
91 TATA POWER - DDL MOTI NAGAR 1302 PREVENTIVE MAINTENANCE 30.04.24 07:00 30.04.24 09:00 PART OF NARAINA INDUSTRIAL AREA 02:00:00
92 TATA POWER - DDL MOTI NAGAR 1303 PREVENTIVE MAINTENANCE 30.04.24 10:30 30.04.24 13:30 PART OF CHUNNA BHATTI SUB/STATION 03:00:00
93 TATA POWER - DDL MOTI NAGAR 1304 PREVENTIVE MAINTENANCE 30.04.24 09:00 30.04.24 12:00 PART OF PUSA 03:00:00
94 TATA POWER - DDL NARELA 511 PREVENTIVE MAINTENANCE 01.05.24 11:00 01.05.24 15:00 PART OF NANGALI POONA 04:00:00
95 TATA POWER - DDL NARELA 511 PROJECT WORK 30.04.24 11:00 30.04.24 15:00 PART OF ZINDPUR 04:00:00
96 TATA POWER - DDL NARELA 511 PREVENTIVE MAINTENANCE 30.04.24 11:00 30.04.24 15:00 PART OF ZINDPUR 04:00:00
97 TATA POWER - DDL NARELA 511 PREVENTIVE MAINTENANCE 02.05.24 11:00 02.05.24 15:00 PART OF RENNY WELL 04:00:00
98 TATA POWER - DDL NARELA 511 PREVENTIVE MAINTENANCE 03.05.24 11:00 03.05.24 15:00 PART OF SUNDER VIHAR 04:00:00
99 TATA POWER - DDL NARELA 517 PREVENTIVE MAINTENANCE 30.04.24 11:00 30.04.24 15:00 PART OF BAKOI 04:00:00
100 TATA POWER - DDL NARELA 517 PREVENTIVE MAINTENANCE 30.04.24 11:00 30.04.24 15:00 PART OF JHANGOLA 04:00:00
101 TATA POWER - DDL NARELA 517 PROJECT WORK 30.04.24 11:00 30.04.24 15:00 PART OF RENNY WELL 04:00:00
102 TATA POWER - DDL NARELA 517 PREVENTIVE MAINTENANCE 01.05.24 11:00 01.05.24 15:00 PART OF RENNY WELL 04:00:00
103 TATA POWER - DDL NARELA 517 PROJECT WORK 30.04.24 11:00 30.04.24 15:00 PART OF GOVIND COLONY 04:00:00
104 TATA POWER - DDL NARELA 522 PREVENTIVE MAINTENANCE 30.04.24 10:30 30.04.24 14:30 PART OF A 10 PKT 6 04:00:00
105 TATA POWER - DDL PITAMPURA 504 PREVENTIVE MAINTENANCE 04.05.24 07:00 04.05.24 09:00 PART OF C BLOCK MIA PH-2 02:00:00
106 TATA POWER - DDL PITAMPURA 504 PREVENTIVE MAINTENANCE 05.05.24 07:00 05.05.24 09:00 PART OF C BLOCK MIA PH-2 02:00:00
107 TATA POWER - DDL PITAMPURA 504 PREVENTIVE MAINTENANCE 11.05.24 07:00 11.05.24 09:00 PART OF C BLOCK MIA PH-2 02:00:00
108 TATA POWER - DDL PITAMPURA 504 PREVENTIVE MAINTENANCE 07.05.24 07:00 07.05.24 09:00 PART OF C BLK MIA PH-2 02:00:00
109 TATA POWER - DDL PITAMPURA 504 PREVENTIVE MAINTENANCE 08.05.24 07:00 08.05.24 09:00 PART OF C BLK MIA PH-2 02:00:00
110 TATA POWER - DDL PITAMPURA 504 PREVENTIVE MAINTENANCE 09.05.24 07:00 09.05.24 09:00 PART OF C BLK MIA PH-2 02:00:00
111 TATA POWER - DDL PITAMPURA 504 PREVENTIVE MAINTENANCE 10.05.24 07:00 10.05.24 09:00 PART OF C BLK MIA PH-2 02:00:00
112 TATA POWER - DDL PITAMPURA 504 PREVENTIVE MAINTENANCE 06.05.24 07:00 06.05.24 09:00 PART OF C BLK MIA PH-2 02:00:00
113 TATA POWER - DDL PITAMPURA 504 PREVENTIVE MAINTENANCE 01.05.24 07:00 01.05.24 09:00 PART OF C BLK MIA PH-2 02:00:00
114 TATA POWER - DDL PITAMPURA 504 PREVENTIVE MAINTENANCE 02.05.24 07:00 02.05.24 09:00 PART OF  C BLK MIA PH-2 02:00:00
115 TATA POWER - DDL PITAMPURA 504 PREVENTIVE MAINTENANCE 03.05.24 07:00 03.05.24 09:00 C BLOCK MIA- PH 2 02:00:00
116 TATA POWER - DDL PITAMPURA 504 PREVENTIVE MAINTENANCE 30.04.24 07:00 30.04.24 09:00 C BLK MIA PH - 2 02:00:00
117 TATA POWER - DDL PITAMPURA 508 PREVENTIVE MAINTENANCE 04.05.24 10:30 04.05.24 14:30 PART OF PETROL PUMP AND SPASTH EDUCATION 04:00:00
118 TATA POWER - DDL PITAMPURA 530 PREVENTIVE MAINTENANCE 02.05.24 11:00 02.05.24 15:00 PART OF INDRAPRASTHA GAS LIMITED(IGL). 04:00:00
119 TATA POWER - DDL ROHINI 551 PREVENTIVE MAINTENANCE 30.04.24 11:30 30.04.24 15:00 PARTS OF MANGOLPUR KHURD 03:30:00
120 TATA POWER - DDL ROHINI 571 PREVENTIVE MAINTENANCE 30.04.24 08:30 30.04.24 10:30 PART OF RG COMPLEX S/S 02:00:00
121 TATA POWER - DDL SHALIMARBAGH 532 PREVENTIVE MAINTENANCE 01.05.24 10:30 01.05.24 12:30 PART OF JHARODA 02:00:00
122 TATA POWER - DDL SHALIMARBAGH 532 PREVENTIVE MAINTENANCE 01.05.24 14:00 01.05.24 16:00 PART OF WAZIRABAD 02:00:00