| TATA POWER - DDL Distribution System Outage Request From 04-Dec-2025 To 04-Jan-2026 |
| S. No |
Discom |
Distt |
Zone |
DESCRIPTION |
Date Time from |
Date Time to |
Area affected |
Total Duration (in Hrs) |
| 1 |
TATA POWER - DDL |
BADLI |
572 |
PREVENTIVE MAINTENANCE |
04.12.25 11:00 |
04.12.25 15:00 |
PART OF DULIYA COLONY |
4 |
| 2 |
TATA POWER - DDL |
BAWANA |
512 |
PROJECT WORK |
04.12.25 10:30 |
04.12.25 14:30 |
PART OF KRISHNA VIHAR BAWANA AND PART OF INDRAJ COLONY |
4 |
| 3 |
TATA POWER - DDL |
BAWANA |
521 |
PREVENTIVE MAINTENANCE |
04.12.25 11:00 |
04.12.25 15:00 |
PART OF POOTH VILLAGE |
4 |
| 4 |
TATA POWER - DDL |
BAWANA |
533 |
PREVENTIVE MAINTENANCE |
04.12.25 11:30 |
04.12.25 15:30 |
PART OF LM BLOCK |
4 |
| 5 |
TATA POWER - DDL |
BAWANA |
533 |
PREVENTIVE MAINTENANCE |
04.12.25 11:00 |
04.12.25 15:00 |
PART OF O BLOCK |
4 |
| 6 |
TATA POWER - DDL |
CIVIL LINES |
411 |
PREVENTIVE MAINTENANCE |
04.12.25 11:00 |
04.12.25 13:00 |
PART OF 9 RAJ NARAIN ROAD |
2 |
| 7 |
TATA POWER - DDL |
KESAHAVPURAM |
509 |
PREVENTIVE MAINTENANCE |
04.12.25 12:00 |
04.12.25 13:30 |
PART OF WPIA |
1 |
| 8 |
TATA POWER - DDL |
KESAHAVPURAM |
509 |
PREVENTIVE MAINTENANCE |
04.12.25 10:30 |
04.12.25 12:00 |
PART OF FLATTED FACTORY |
2 |
| 9 |
TATA POWER - DDL |
KESAHAVPURAM |
509 |
PREVENTIVE MAINTENANCE |
04.12.25 14:00 |
04.12.25 15:30 |
PART OF C3 AV PH-2 |
1 |
| 10 |
TATA POWER - DDL |
KIRARI |
523 |
PREVENTIVE MAINTENANCE |
04.12.25 11:00 |
04.12.25 15:00 |
PART OF 70FT KIRARI |
4 |
| 11 |
TATA POWER - DDL |
MOTI NAGAR |
1303 |
PREVENTIVE MAINTENANCE |
04.12.25 10:30 |
04.12.25 12:30 |
PART OF 6B BLOCK RAMESH NAGAR |
2 |
| 12 |
TATA POWER - DDL |
MOTI NAGAR |
1304 |
PREVENTIVE MAINTENANCE |
04.12.25 10:30 |
04.12.25 14:30 |
PART OF PUSA |
4 |
| 13 |
TATA POWER - DDL |
NARELA |
511 |
PREVENTIVE MAINTENANCE |
04.12.25 11:00 |
04.12.25 13:00 |
PART OF KUSHAK NO-2 |
2 |
| 14 |
TATA POWER - DDL |
NARELA |
511 |
PREVENTIVE MAINTENANCE |
04.12.25 11:00 |
04.12.25 13:00 |
PART OF KUSHAK NO-2 |
2 |
| 15 |
TATA POWER - DDL |
NARELA |
511 |
PREVENTIVE MAINTENANCE |
04.12.25 14:00 |
04.12.25 16:00 |
PART OF KUSHAK NO-2 |
2 |
| 16 |
TATA POWER - DDL |
NARELA |
511 |
PREVENTIVE MAINTENANCE |
04.12.25 14:00 |
04.12.25 16:00 |
PART OF KUSHAK NO-2 |
2 |
| 17 |
TATA POWER - DDL |
NARELA |
511 |
PREVENTIVE MAINTENANCE |
04.12.25 11:00 |
04.12.25 13:00 |
PART OF AMAN COLONY |
2 |
| 18 |
TATA POWER - DDL |
NARELA |
514 |
PREVENTIVE MAINTENANCE |
04.12.25 11:00 |
04.12.25 15:00 |
PART OF SWATANTRATA NAGAR |
4 |
| 19 |
TATA POWER - DDL |
NARELA |
517 |
PREVENTIVE MAINTENANCE |
04.12.25 11:00 |
04.12.25 15:00 |
PART OF BAKHTAWARPU |
4 |
| 20 |
TATA POWER - DDL |
NARELA |
522 |
PREVENTIVE MAINTENANCE |
04.12.25 07:30 |
04.12.25 09:30 |
PART OF D-1543 TO D-1562 |
2 |
| 21 |
TATA POWER - DDL |
PITAMPURA |
504 |
PREVENTIVE MAINTENANCE |
04.12.25 11:00 |
04.12.25 13:00 |
PART OF BC BLOCK MIA PH-2 |
2 |
| 22 |
TATA POWER - DDL |
PITAMPURA |
508 |
PREVENTIVE MAINTENANCE |
04.12.25 11:00 |
04.12.25 14:00 |
PART OF AU EKTA CAMP JHUGGI |
3 |
| 23 |
TATA POWER - DDL |
PITAMPURA |
510 |
PREVENTIVE MAINTENANCE |
04.12.25 10:30 |
04.12.25 12:30 |
PART OF RISHI NAGAR |
2 |
| 24 |
TATA POWER - DDL |
PITAMPURA |
510 |
PREVENTIVE MAINTENANCE |
04.12.25 14:00 |
04.12.25 16:00 |
PART OF RANI BAGH |
2 |
| 25 |
TATA POWER - DDL |
ROHINI |
551 |
PREVENTIVE MAINTENANCE |
04.12.25 14:00 |
04.12.25 16:00 |
PART OF SEC-1 |
2 |
| 26 |
TATA POWER - DDL |
ROHINI |
551 |
PREVENTIVE MAINTENANCE |
04.12.25 10:00 |
04.12.25 12:00 |
PART OF SEC-1 |
2 |
| 27 |
TATA POWER - DDL |
SHALIMARBAGH |
414 |
PREVENTIVE MAINTENANCE |
04.12.25 10:30 |
04.12.25 14:30 |
PART OF CHANDAN VIHAR |
4 |
| 28 |
TATA POWER - DDL |
SHALIMARBAGH |
503 |
PREVENTIVE MAINTENANCE |
04.12.25 08:00 |
04.12.25 10:00 |
PART OF RUN AREA |
2 |
| 29 |
TATA POWER - DDL |
SHALIMARBAGH |
531 |
PREVENTIVE MAINTENANCE |
04.12.25 10:30 |
04.12.25 12:30 |
PART OF SHALAMAR VILLAGE |
2 |
| 30 |
TATA POWER - DDL |
SHALIMARBAGH |
531 |
PREVENTIVE MAINTENANCE |
04.12.25 13:45 |
04.12.25 15:45 |
PART OF SHALAMAR VILLAGE |
2 |
| 31 |
TATA POWER - DDL |
NARELA |
522 |
PREVENTIVE MAINTENANCE |
05.12.25 07:30 |
05.12.25 09:30 |
PART OF SINGHOLA VILLAGE E 736 TO E 753, E 754 TO E 761 |
2 |
| 32 |
TATA POWER - DDL |
SHALIMARBAGH |
503 |
PREVENTIVE MAINTENANCE |
05.12.25 08:00 |
05.12.25 10:00 |
PART OF SSI INDUSTRIAL AREA |
2 |
| 33 |
TATA POWER - DDL |
KIRARI |
513 |
PROJECT WORK |
05.12.25 10:00 |
05.12.25 14:00 |
PART OF RAMA VIHAR |
4 |
| 34 |
TATA POWER - DDL |
ROHINI |
551 |
PREVENTIVE MAINTENANCE |
05.12.25 10:00 |
05.12.25 12:00 |
PART OF SEC-8 |
2 |
| 35 |
TATA POWER - DDL |
KESAHAVPURAM |
501 |
PREVENTIVE MAINTENANCE |
05.12.25 10:30 |
05.12.25 12:30 |
PART OF C-5 DES PARK |
2 |
| 36 |
TATA POWER - DDL |
KESAHAVPURAM |
501 |
PREVENTIVE MAINTENANCE |
05.12.25 10:30 |
05.12.25 12:30 |
PART OF C-5 DESU PARK |
2 |
| 37 |
TATA POWER - DDL |
BADLI |
572 |
PREVENTIVE MAINTENANCE |
05.12.25 11:00 |
05.12.25 15:00 |
PART OF ALIPUR INDUSTRIAL AREA |
4 |
| 38 |
TATA POWER - DDL |
BAWANA |
533 |
PREVENTIVE MAINTENANCE |
05.12.25 11:00 |
05.12.25 15:00 |
PART OF KANJHAWALA |
4 |
| 39 |
TATA POWER - DDL |
KIRARI |
523 |
PREVENTIVE MAINTENANCE |
05.12.25 11:00 |
05.12.25 14:00 |
PART OF SARDA VATS |
3 |
| 40 |
TATA POWER - DDL |
KIRARI |
523 |
PREVENTIVE MAINTENANCE |
05.12.25 11:00 |
05.12.25 14:00 |
PART OF SHARDA VATS |
3 |
| 41 |
TATA POWER - DDL |
MANGOLPURI |
515 |
PREVENTIVE MAINTENANCE |
05.12.25 11:00 |
05.12.25 14:00 |
PART OF F BLK MGP |
3 |
| 42 |
TATA POWER - DDL |
MANGOLPURI |
518 |
PREVENTIVE MAINTENANCE |
05.12.25 11:00 |
05.12.25 15:00 |
PART OF S. PUR MAZRA VILL NEAR BARAT GHAR |
4 |
| 43 |
TATA POWER - DDL |
MODEL TOWN |
412 |
PREVENTIVE MAINTENANCE |
05.12.25 11:00 |
05.12.25 13:00 |
PART OF MODEL TOWN-3 |
2 |
| 44 |
TATA POWER - DDL |
NARELA |
517 |
PREVENTIVE MAINTENANCE |
05.12.25 11:00 |
05.12.25 15:00 |
PART OF SINGHOLA VILLAGE |
4 |
| 45 |
TATA POWER - DDL |
ROHINI |
561 |
PREVENTIVE MAINTENANCE |
05.12.25 11:00 |
05.12.25 13:00 |
PART OF C-3 SEC-11 |
2 |
| 46 |
TATA POWER - DDL |
SHALIMARBAGH |
414 |
PREVENTIVE MAINTENANCE |
05.12.25 11:00 |
05.12.25 15:00 |
PART OF NUMBARDAR AND TEACHER'S COLONY |
4 |
| 47 |
TATA POWER - DDL |
BAWANA |
533 |
PROJECT WORK |
05.12.25 11:30 |
05.12.25 15:30 |
PART OF BULLA COLONY |
4 |
| 48 |
TATA POWER - DDL |
MANGOLPURI |
519 |
PREVENTIVE MAINTENANCE |
05.12.25 11:30 |
05.12.25 15:30 |
PART OF PKT-3 SEC-21 S/S |
4 |
| 49 |
TATA POWER - DDL |
KIRARI |
513 |
PROJECT WORK |
05.12.25 13:00 |
05.12.25 16:00 |
PART OF KARALA |
3 |
| 50 |
TATA POWER - DDL |
KESAHAVPURAM |
520 |
PREVENTIVE MAINTENANCE |
05.12.25 14:00 |
05.12.25 16:00 |
PART OF DEVA RAM PARK |
2 |
| 51 |
TATA POWER - DDL |
ROHINI |
551 |
PREVENTIVE MAINTENANCE |
05.12.25 14:00 |
05.12.25 16:00 |
PART OF SEC-8 |
2 |
| 52 |
TATA POWER - DDL |
ROHINI |
561 |
PREVENTIVE MAINTENANCE |
05.12.25 14:00 |
05.12.25 16:00 |
PART OF G-7,6 SEC-11 |
2 |
| 53 |
TATA POWER - DDL |
KESAHAVPURAM |
509 |
PREVENTIVE MAINTENANCE |
06.12.25 08:00 |
06.12.25 10:00 |
PART OF WPIA |
2 |
| 54 |
TATA POWER - DDL |
KESAHAVPURAM |
509 |
PREVENTIVE MAINTENANCE |
06.12.25 08:00 |
06.12.25 10:00 |
PART OF WPIA |
2 |
| 55 |
TATA POWER - DDL |
SHALIMARBAGH |
503 |
PREVENTIVE MAINTENANCE |
06.12.25 08:00 |
06.12.25 10:00 |
PART OF INDUSTRIAL AREA |
2 |
| 56 |
TATA POWER - DDL |
BAWANA |
521 |
PREVENTIVE MAINTENANCE |
06.12.25 10:00 |
06.12.25 16:00 |
PART OF B BLK SEC 3 |
6 |
| 57 |
TATA POWER - DDL |
BAWANA |
521 |
PREVENTIVE MAINTENANCE |
06.12.25 10:00 |
06.12.25 16:00 |
PART OF B BLK SEC 3 |
6 |
| 58 |
TATA POWER - DDL |
BADLI |
572 |
PROJECT WORK |
06.12.25 10:30 |
06.12.25 14:30 |
PART OF DULIYA COLONY |
4 |
| 59 |
TATA POWER - DDL |
BAWANA |
512 |
PROJECT WORK |
06.12.25 10:30 |
06.12.25 14:30 |
PART OF ISHWAR COLONY BAWANA |
4 |
| 60 |
TATA POWER - DDL |
KESAHAVPURAM |
501 |
PREVENTIVE MAINTENANCE |
06.12.25 10:30 |
06.12.25 12:30 |
PART OF C-08 KESHAVPURAM |
2 |
| 61 |
TATA POWER - DDL |
KESAHAVPURAM |
520 |
PREVENTIVE MAINTENANCE |
06.12.25 10:30 |
06.12.25 16:30 |
PART OF DEVA RAM PARK |
6 |
| 62 |
TATA POWER - DDL |
MOTI NAGAR |
1301 |
PREVENTIVE MAINTENANCE |
06.12.25 10:30 |
06.12.25 12:30 |
PART OF G BLOCK KIRTINAGAR |
2 |
| 63 |
TATA POWER - DDL |
SHALIMARBAGH |
414 |
PREVENTIVE MAINTENANCE |
06.12.25 10:30 |
06.12.25 14:30 |
PART OF HOOVERS APARTMENT |
4 |
| 64 |
TATA POWER - DDL |
BAWANA |
521 |
PREVENTIVE MAINTENANCE |
06.12.25 11:00 |
06.12.25 13:00 |
PART OF C BLK SEC 4 |
2 |
| 65 |
TATA POWER - DDL |
CIVIL LINES |
416 |
METERING WORK |
06.12.25 11:00 |
06.12.25 13:00 |
PART OF VIJAY NAGAR |
2 |
| 66 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
06.12.25 11:00 |
06.12.25 13:00 |
PART OF MADANPUR MEER VIHAR |
2 |
| 67 |
TATA POWER - DDL |
NARELA |
517 |
PREVENTIVE MAINTENANCE |
06.12.25 11:00 |
06.12.25 15:00 |
PART OF RENNY WELL |
4 |
| 68 |
TATA POWER - DDL |
ROHINI |
561 |
PREVENTIVE MAINTENANCE |
06.12.25 11:00 |
06.12.25 13:00 |
PART OF PKT-6 SEC-5 |
2 |
| 69 |
TATA POWER - DDL |
ROHINI |
581 |
PREVENTIVE MAINTENANCE |
06.12.25 11:00 |
06.12.25 15:00 |
PART OF SEC 17 B BLOCK |
4 |
| 70 |
TATA POWER - DDL |
BAWANA |
521 |
PREVENTIVE MAINTENANCE |
06.12.25 11:30 |
06.12.25 13:30 |
PART OF E BLK SEC 5 |
2 |
| 71 |
TATA POWER - DDL |
BAWANA |
521 |
PREVENTIVE MAINTENANCE |
06.12.25 11:30 |
06.12.25 15:30 |
PART OF P BLK SEC 3 |
4 |
| 72 |
TATA POWER - DDL |
BAWANA |
521 |
PREVENTIVE MAINTENANCE |
06.12.25 12:00 |
06.12.25 14:00 |
PART OF A BLK SEC 5 |
2 |
| 73 |
TATA POWER - DDL |
CIVIL LINES |
411 |
PREVENTIVE MAINTENANCE |
06.12.25 14:00 |
06.12.25 16:00 |
PART OF OLD CIVIL LINE |
2 |
| 74 |
TATA POWER - DDL |
ROHINI |
561 |
PREVENTIVE MAINTENANCE |
06.12.25 14:00 |
06.12.25 16:00 |
PART OF PKT-6 SEC-5 |
2 |
| 75 |
TATA POWER - DDL |
KIRARI |
513 |
PROJECT WORK |
07.12.25 10:00 |
07.12.25 16:00 |
PART OF UTSAV VIHAR |
6 |
| 76 |
TATA POWER - DDL |
KESAHAVPURAM |
509 |
PREVENTIVE MAINTENANCE |
08.12.25 08:00 |
08.12.25 10:00 |
PART OF WPIA |
2 |
| 77 |
TATA POWER - DDL |
KESAHAVPURAM |
509 |
PREVENTIVE MAINTENANCE |
08.12.25 08:00 |
08.12.25 10:00 |
PART OF WPIA |
2 |
| 78 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
08.12.25 10:00 |
08.12.25 14:00 |
PART OF SUKHBIR NAGAR |
4 |
| 79 |
TATA POWER - DDL |
MOTI NAGAR |
1301 |
PREVENTIVE MAINTENANCE |
08.12.25 10:30 |
08.12.25 12:30 |
PART OF FURNITURE MARKET |
2 |
| 80 |
TATA POWER - DDL |
MOTI NAGAR |
1301 |
PREVENTIVE MAINTENANCE |
08.12.25 10:30 |
08.12.25 12:30 |
PART OF FURNITURE MARKET |
2 |
| 81 |
TATA POWER - DDL |
NARELA |
517 |
PREVENTIVE MAINTENANCE |
08.12.25 11:00 |
08.12.25 15:00 |
PART OF RENNY WELL |
4 |
| 82 |
TATA POWER - DDL |
ROHINI |
561 |
PREVENTIVE MAINTENANCE |
08.12.25 11:00 |
08.12.25 13:00 |
PART OF C-1,2,3,4,SEC-5 |
2 |
| 83 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
08.12.25 14:00 |
08.12.25 16:00 |
PART OF VIDYAPTI NAGAR |
2 |
| 84 |
TATA POWER - DDL |
ROHINI |
561 |
PREVENTIVE MAINTENANCE |
08.12.25 14:00 |
08.12.25 16:00 |
PART OF C-1,2,3,4,5 SEC-5 |
2 |
| 85 |
TATA POWER - DDL |
KIRARI |
513 |
PROJECT WORK |
09.12.25 11:00 |
09.12.25 15:00 |
PART OF MADANPUR |
4 |
| 86 |
TATA POWER - DDL |
NARELA |
517 |
PREVENTIVE MAINTENANCE |
09.12.25 11:00 |
09.12.25 15:00 |
PART OF SINGHOLA VILLAGE |
4 |
| 87 |
TATA POWER - DDL |
ROHINI |
561 |
PREVENTIVE MAINTENANCE |
09.12.25 11:00 |
09.12.25 13:00 |
PART OF C-5,4 SEC-6 |
2 |
| 88 |
TATA POWER - DDL |
ROHINI |
561 |
PREVENTIVE MAINTENANCE |
09.12.25 14:00 |
09.12.25 16:00 |
PART OF C-4,5 |
2 |
| 89 |
TATA POWER - DDL |
NARELA |
517 |
PREVENTIVE MAINTENANCE |
10.12.25 11:00 |
10.12.25 15:00 |
PART OF PALLA AGRICULTURE |
4 |
| 90 |
TATA POWER - DDL |
NARELA |
517 |
PREVENTIVE MAINTENANCE |
10.12.25 11:00 |
10.12.25 15:00 |
PART OF PALLA |
4 |
| 91 |
TATA POWER - DDL |
ROHINI |
561 |
PREVENTIVE MAINTENANCE |
10.12.25 11:00 |
10.12.25 13:00 |
PART OF D-6,7 |
2 |
| 92 |
TATA POWER - DDL |
ROHINI |
561 |
PREVENTIVE MAINTENANCE |
10.12.25 14:00 |
10.12.25 16:00 |
PART OF B-2,3 SEC-6 |
2 |
| 93 |
TATA POWER - DDL |
NARELA |
517 |
PREVENTIVE MAINTENANCE |
11.12.25 11:00 |
11.12.25 15:00 |
PART OF RENNY WELL |
4 |
| 94 |
TATA POWER - DDL |
ROHINI |
561 |
PREVENTIVE MAINTENANCE |
11.12.25 11:00 |
11.12.25 13:00 |
PART OF D-6,7,8,A-1 SEC-6 |
2 |
| 95 |
TATA POWER - DDL |
ROHINI |
561 |
PREVENTIVE MAINTENANCE |
11.12.25 14:00 |
11.12.25 16:00 |
PART OF D-6,7,8 SEC-6 |
2 |
| 96 |
TATA POWER - DDL |
BAWANA |
521 |
PREVENTIVE MAINTENANCE |
13.12.25 10:00 |
13.12.25 16:00 |
PART OF F BLK SEC 3 |
6 |
| 97 |
TATA POWER - DDL |
BAWANA |
521 |
PREVENTIVE MAINTENANCE |
13.12.25 10:00 |
13.12.25 16:00 |
PART OF E BLOCK SEC 3 |
6 |
| 98 |
TATA POWER - DDL |
BAWANA |
521 |
PREVENTIVE MAINTENANCE |
13.12.25 11:00 |
13.12.25 13:00 |
PART OF P BLK SEC 5 |
2 |
| 99 |
TATA POWER - DDL |
MOTI NAGAR |
1303 |
PREVENTIVE MAINTENANCE |
15.12.25 10:30 |
15.12.25 13:30 |
PART OF D BLOCK SUDERSHAN PARK |
3 |
| 100 |
TATA POWER - DDL |
KIRARI |
513 |
PREVENTIVE MAINTENANCE |
20.12.25 10:00 |
20.12.25 16:00 |
PART OF GALI NO 5 JAIN NAGAR |
6 |
| 101 |
TATA POWER - DDL |
ROHINI |
551 |
PREVENTIVE MAINTENANCE |
30.12.25 11:00 |
30.12.25 15:00 |
PART OF VIJAY VIHAR-2 |
4 |